in Bobo-Dioulasso Burkina Faso  sales   price   shop   near me   near me shop   factory   supplier LPG Gas Cylinder Manufacturing Line Body Welding Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

With a lot of years’ knowledge in this line, we will be trusted by our rewards in aggressive price tag, a single-time supply, prompt reaction, on-hand engineering assistance and good following-revenue solutions.Moreover, all our generation methods are in compliance with ISO9001 requirements. In the meantime, our merchandise are produced in accordance to large good quality specifications, and complying with the intercontinental superior normal criteria. The group is centered on generating all assortment of regular roller chains and sprockets, gears & gearboxes, this sort of as conveyor chain & sprockets , stainless metal chain, agricultural chain and has not just sold its items all in excess of china, but also sold far more than sixty five% goods to oversees, including Europe, America, South-east Asia, and it also has established up storage logistics in spots like Europe. LPG gas cylinEPTTmanufacturing line body welding EPTT

I. Full computerized welding line ( EPTTry record)

1 EPTT trimming amp poEPTTng EPTT
two EPTT hole punching EPTT
three EPTT joggling EPTT
four Autoamtic socket welding EPTT
five EPTT manage welding EPTT
6 EPTT base foundation welding EPTT
7 EPTTg welding EPTT
8 EPTT EPTTitudinal seam welding EPTT
9 Are plate reducing amp poEPTTng EPTT
10 EPTT head assembly and tag welding
11 EPTT head circumferential seam welding EPTT

EPTT head circumferential seam welding EPTT:

EPTT EPTTitudinal seam welding EPTT

Manage/Base foundation welding line

II. EPTnical parameter:

A. EPTT trimming amp poEPTTng EPTT

This EPTT is used for higher/reduced cap trimming, edge welding part outer poEPTTng. The principal shaft motor is five.5KW, the poEPTTng motor is one.5KW.
The EPTT makes use of 4 column EPT presser composition, PLC control, loading/unloading by mechanical arm, the cEPTTr mould rotation is EPTn by motor and EPT case, the protect is EPTn by the best oil cylinEPTTto find and push the workpiece, EPT method EPTs outer blade feeding, the outer blade follows by the internal blade dish on the main shaft and cap workpiece to rotate and reducing. Side has a poEPTTng EPTT, the poEPTTng dish will EPTTr to remove the dust on the upper cap welding region, then rotation trimming and poEPTTng complete at the identical time. The outer blade and poEPTTng dish reset, the major oil cylinEPTTEPTn sliEPTTreset, and the assistance plaaet will rise the upper cap and flash in area.The unloading mechanical arm moves into the cEPTTr of the mould to remove the workpiecce to the middle conveyor, then transfer to gap punching EPTT. The internal/outer blade employs higher put on-resistant high toughness die steel content, EPTT doing work daily life, it can reuse right after processing by the surface area grinding EPTT,The interior/outer blade gap is 0mm, the length between the cutting into outer blade and internal blade is .2mm.

2 set tools has unbiased EPT station No.1 and No.four, vane pump, 11KW. Every single EPT station feeding the oil to two sets oil cylinders of the tools, is EPT sliEPTTlifting and outer blade feeding reset, the EPTT operating force set price: outer blade nine MPa, sliEPTT(go over): 9MPa.

B. EPTT gap punching EPTT

This EPTT is utilised for upper cap hole punching.

The EPTT makes use of 4 column EPT presser construction, PLC management, loading/unloading by mechanical arm, the mechanical arm will quit after pushing the workpiece into the assist pallet, the sliEPTTfalling down is EPTn by the prime oil cylinder, the cap EPTTrs into the decrease mould, the upper mould constant relocating down to end the gap punching, the scrap EPT into the mixture box through the lower mould cEPTTr gap. The higher mould and sliEPTTdelay reset, increase the higher cap in spot, the unloading mechanical arm EPTTrs into the mould cEPTTr to remove the workpiece to the center conveyor, then transfer to the socket welding and poEPTTng EPTT.

Equips with No.5 EPT station, one set, plunger pump. Setting strain is 16MPa

C. Socket welding amp poEPTTng EPTT

This EPTT is used for upper cap socket welding and edge welding component poEPTTng. Equip with Panasonic YD-350GL4 welEPTT1 established, drinking water cooling welding torch 1 pcs, 8L computerized cycle h2o cooling tank one established. The main shaft motor is .75KW. PoEPTTng motor is one.5KW, equip with the grating stability safety.

The EPTT makes use of four column EPT presser framework, loading/unloading by mechanical arm, front is socket welding, driving is interior poEPTTng, the cEPTTr mould rotation EPTs by the motor, alter velocity by EPT transducer. Place the socket in the higher cap cEPTTr hole by handbook, the top oil cylinEPTTEPTs the sliEPTTmoving down, clamp the workpiece, identify and push at 1 time. Soon after beginning the automatic operating program, the mould workpiee rotates, the welding torch feeds in, and automatic arc welding. At the exact same time, the driving internal poEPTTng dish moves to exterior, poEPTTng the upper cap edge welding component. The welding and poEPTTng finish at the identical time. Soon after then, the oil cylinEPTTreset, workpiece rises in location, the unloading mechanical arm EPTTrs into the mould cEPTTr to get rid of the workpiece, and transfer to the handle welding EPTT via middle conveyor.

Equip with NO. six EPT station, 1 set, vane pump, 5.5KW. Location pressure: slipping four MPa, climbing nine MPa.

D. EPTT handle welding EPTT, one established

This EPTT is used for upper cap hadnle welding. Equip with three sets welding torch, three EPTs finish at 1 time. Equip with Panasonic YD-350GL4 EPTs three sets, welding torch three pieces. Major shaft motor is .4KW, with the grating protection security.

The EPTT employs four column EPT presser structure, PLC manage, loading/unloading by mechanical arm, motor EPTs the workpiece rotation. Manually place the handle in the higher mould cEPTTr situation which is mounted by the magnet, the loading mechanical arm quit after shipping and delivery the upper cap to the mould cEPTTr placement, the oil cylinEPTTfalling EPTs the higher mould and manage press the higher cap in placement, the automated functioning software commences, the cEPTTr mould workpiece rotates, a few welding torch feeding in at the very same time, automated arc welding. After end, the oil cylinEPTTresets, and workpiece rises in location, the unloading mechanical arm EPTTrs into the mould cEPTTr to clamp the upper cap and set on the center conveyor, then transfer to the assembly amp location welding EPTT.

Equip with No.7 EPT station, vane pump, five.5KW. Environment strain: pressing 4MPa, climbing 9MPa.

E. EPTT joggling EPTT

The EPTT is used for decrease cap trimming, joggling and outer poEPTTng. Primary shaft 5,5KW, poEPTTng motor one.5KW.

The EPTT utilizes 4 column EPT presser composition, PLC handle, loading/unloading by mechanical arm, motor EPTs the cEPTTr mould rotation, the top oil cylinEPTTEPT the deflectable upper presser clamp the workpiece, the EPT system EPTs the outer blade feeding in, and do decrease cap rotating and joggling. Fter joggling, the outer blade reset, and main oil cylinEPTTEPTs the sliEPTTreset, the assistance pallet rises the reduced cap in location. The unloading mechanical arm EPTTrs into the mould cEPTTr to remove the workpiece to the middle conveyor, then transfer to the base foundation welding EPTT. The internal/outer blade uses substantial wear-resistant higher toughness die metal substance, EPTT working existence.

Equip with No.two EPT station, vane pump, five.5KW. Driving the sliEPTTlifting and outer blade feeding and reset. The environment strain: doing work pressure 9MPa, outer blade 9MPa, sliEPTT(protect) 9MPa.

F. EPTT bottom foundation welding EPTT

This EPTT is utilized for reduced cap base base welding, equip with 3 welding torch, six EPTs could be concluded at two times. Equip with Panasonic YD-350GL4 welEPTT3 sets, welding torch three piece. Main shaft motor .4KW, with the grating security protection.

The EPTT makes use of four column EPT presser framework, PLC management, loading/unloading by mechanical arm, motor EPTs the workpiece rotation. Manually set the bottom foundation in the higher mould cEPTTr place which is mounted by the magnet. The loading mechanical arm quits following sending the higher cap to the mould cEPTTr position. The oil cylinEPTTfalls down EPTs the upper mould and base base to push the upper cap in situation, the automatic working program begin, the cEPTTr mould workpiece rotates, 3 welding torch feeding in at the exact same time, automatic arc welding. Following welding, the oil cylinEPTTreset, the workpiece rises in location, the unloading mechanical arm EPTTrs into the mould cEPTTr to clamp the upper cap and place on the center conveyor.

Equip with No.3 EPT station, vane pump, 5.5KW, environment stress: pressing 4MPa, climbing 10MPa.

G. Assembly and location welding EPTT

The EPTT is utilized for assembling the upper cap and decrease cap, vertical variety. Air cylinEPTTpress suit equips with press head link rod, utilized for both 9kg and 14kg, adjust the connection rod to change. Manually place the reduce cap on the platform, beside the position, place the take care of opener of the upper cap opposite to the bottom foundation welEPTTjoint, then assembly the higher cap into the lower cap jogging component, open up the manual manage air valve, the previously mentioned cylinEPTTpush the push head on the socket, computerized push the higher and lower cap. Check the lap joint, if essential, use the wooden hammer to click on the lap joint to make it much more closer, Following assembling, guide place welding, about two~3 EPTs for a single circle. Right after welding, manually thrust the cylinEPTTto the loading conveyor, the take care of is in entrance and base base is in behind, the assembly and place welding EPTT equips with SuperTIG-315 manual arc welEPTT1 established.

H. EPTT circumferential welding EPTT

The EPTT is utilized for circumferential welding of upper and reduce cap, equip with welEPTTvision tracking system, complete the circumferential welding automatically, total automated and no operator, every set equips with Panasonic YD-500GS higher pace welEPTT1 set, h2o cooling welding torch one piece, 8L circle cooling tank 1 piece. Equip with welEPTTvision monitoring method 1 set. The EPT manage system uses EPT PLC management unit, professional-experience color contact EPT procedure EPT.

The EPTT employs horizontal double shafts structure, the primary shaft and the bottom shaft is the identical, air cylinEPTTEPTs the feeding, reverse relocating clamp is using for clamping or loosing the workpie. The main shaft EPTs by the speed EPEPT, alter pace by the EPT transducer, the principal shaft motor EPTT is .75KW. The principal shaft and base shaft have unbiased welding mould, the welding torch position can be adjusted aEPTT the cylinEPTTaxes direction, there has wonderful tuning in the welding torch, precision wonderful tuning the welding torch place. The EPTT head has welEPTTvision tracking program, X/Y shaft two dimension tracking EPTs the welding torch, X-shaft stepping motor 6N middotm, Y-shaft stepping motor 12N middotm. The EPTT head has exhaust pipe utilised for concentrating and exhaust the smoke. Equip with magnet mechanical arm system, 3 functioning placement loading/unloading device, loading/unloading conveyor, unloading raceway.

Be aware: 1.) The arc situation of circumferential welding ought to in the same line with bottom foundation welEPTTjoint two.) Before switch off the circumferential welding EPTT, must turn off the vision tracker initial, then flip off the circumferential equipment EPTT.

III. EPT operating in customers’ EPTT

IV. Advantage

A. Minimizing labour EPT – Our EPTTs can run much more than 15 several years, only 1 particular person for getting treatment of 6 sets of circumferential welding EPTTs.

B. Reducing electric power – welding pace is only 60 seconds for one circle

C. Lowering welding wires – (only 1 circle welding is required).

D. EPTTer procedure existence

E. Much less spatter – We paid out about two million for Patent of YD-500GS Panasonic welding EPTTs

V. Client reference listing

one .TK Group in Bangladesh
two. HangEPT XiHu (West EPT) Dis.hu (West EPT) Dis. EPTshan Steel CylinEPTTEPTT,Ltd.http://, it is third greatest LPG fuel cylinEPTTmanufacturer in EPTT, everyday output is 18000pcs incXiHu (West EPT) Dis.Hu (West EPT) Dis. all sizes from 2kgs to 50kgs.

3. TPA is producing incredibly higher high quality LPG cylinders for North America, European,United kingdom and Australia. http://, we equipped automated welding line for their EPTT EPTT in HangEPT. Now we are developing new LPG fuel cylinEPTTfactory in Vietnam, Hangphone, at the conclude of EPTTst , 2017, it will be set up and commissed.

four: ZheJiang EPTTnri Team co.,Ltd., http://en.huanrigroup.cn/goods_listing/pmcId=24.html, they are largest and strongest cylinEPTTmanufacturer in EPTT, they bougEPTT our EPTTs the two for 12.5 and15kgs producing and 50kgs production.

five.AYGAZ in Turkey, .tr, last 7 days, they have already ordered the comprehensive welding line at us right after evaluating with Noticed welding.

six. Manchester EPTTnk from Usa

7. Sahuwala CylinEPTTin India

8. EPT LPG Restricted (SEACOM Group), they are location up a new EPTT and we will take liable for their twelve.5kgs and 33kgs creation line.

FAQ
LPG cylinder manufacturing products
Q: What dimension of LPG cylinder your EPTT can generate?
A: 6kg, 12kg,15kgs and 50kgs LPG cylinder for cooking and other size in accordance customers’ need.
Q: Can you layout EPTTs in accordance LPG cylinder technical drawing?
A: Positive, please send out your technical drawing to us.
Q: What are the rewards to decide on your EPTTs?
A: Our EPTTs are powerful and trustworthy for EPTT term EPTT producing

We need to have to know pursuing information to quotation you proper EPTTries:

1.EPTnical Drawing of the cylinders you want to make?
2.What dimension of cylinder you want to generate?(6kg, 12kg)
3.What diameter and thickness of the cylinder you want to make?
four.Are you new in this region or you previously have some EPTTs in the workshop?
five.Capacity you demand, i.e. how many parts and measurements you want to make for every working day?

  in Bobo-Dioulasso Burkina Faso  sales   price   shop   near me   near me shop   factory   supplier LPG Gas Cylinder Manufacturing Line Body Welding Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Bobo-Dioulasso Burkina Faso  sales   price   shop   near me   near me shop   factory   supplier LPG Gas Cylinder Manufacturing Line Body Welding Machine manufacturer   best   Cost   Custom   Cheap   wholesaler