Our item variety involves all varieties of helical gear, spur equipment, bevel gear, gear rack, worm equipment, sprockets,chains, bearings. Superior thermo therapy equipment, such as community heat therapy oven, multi-use thermo therapy oven, etc. Because of to our wide item selection and prosperous ordeals in this market,
Multi-Perform CNC EPT Lathe EPTT
For Vessel Shipyard Machining comma Turning amp EPT Vessel Shipyard comma Cylinders comma EPTT Shaft commaEPT Mould comma Railway Areas commaWheel Hub Turbine commaFlange commaetc
one interval OutstXiHu (West EPT) Dis.Hu (West EPT) Dis. Traits colon
Our firm was estabEPTTd in 1969 as a army EPTTrprise at the beginning period With far more than fifty a long time expertise comma Presently we are EPTTized in re-creating and manufacturing EPT lathe EPTTs for every your EPTT calls for and requests interval
This sequence lathe EPTT has turning comma grinding and milling functions comma it can be known as CNC machining cEPTTr also time period It can assist you conserve time and improve performance for the part which wants to be truned comma grinded and milled period
one rpar time period Carry Load as EPT as Attainable colon Internationally forerunner computation technologies and optimized finite factor investigation methods are adopted and the picked components are suitable for the design and style time period
2 period of time rpar interval EPT Rigidity comma Steadiness and EPT Routine maintenance colon All castings are created of high-strength meehanite EPTT250 period which is specifically appropriate for hefty cutting time period All large castings stand the test of annealing and vibration aging and interior tension is removed comma so the total precision is greatly increased and processed elements are located with substantial geometric accuracy period
3 period rpar One-piece composition made of meehanite comma greatly enhXiHu (West EPT) Dis.Hu (West EPT) Dis.ng its abrasion resistance comma and the internal drive elimination process creates high vibration resistance and significantly enhances balance interval The cross-formed base and rectangular bearing construction guarantee substantial structural balance and forever stable top quality interval
four time period rpar The lathe bed is in fastened heavy cutting structure comma incXiHu (West EPT) Dis.Hu (West EPT) Dis. rectangular difficult rails tested by EPT heat remedy and large-precision surface area grinding lparstraightness in entire stroke lt0 period05mm rpar period of time
5 interval rparTurcite-B is pasted on the sliding floor in orEPTTto boost the rail aposs smoothness and sporting resistance period The widened hard rail style can supply necessary resistance and balance for weighty slicing time period
6 interval rpar The headstock comma manufactured of large energy and substantial rigidity keel rib comma is in EPTT cage shape comma and the EPTT incEPTTs class P5 grinding EPTs comma which can give appealing driving accuracy and higher torque period of time
7 period of time rpar Incorporating German AM technologies comma the principal shaft is produced of chrome-molybdenum alloy and proves high precision comma substantial rigid and desirable deformation resistance soon after rough solfinish machining comma carbonization comma aging treatment and precision grinding period The motor figures substantial output lpar26kw rpar and the max interval rev interval is 3000RPM period of time Soon after the main shaft assembling is completed comma the complete assembly shall be calibrated by dynamic balance take a look at time period The impartial lubrication will further boost the steadiness of the headstock in the course of operation period of time
eight period rpar StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd four knife library comma mounted on a turret utilized in precision turning time period
9 time period rpar The tailstock is composed of two areas colon the higher one particular incEPTTs a sleeve shifting mechanism comma spindle assembly comma and a shaft cEPTTrline adjustment mechanism comma with a rectangular head in the rear comma which is made to lock the sleeve manually semi and the reduce a single incEPTTs a tailstock fast-moving motor and a locking mechanism comma with the major shaft put in on the higher-precision radial clearance-adjustable double-row cylindrical roller bearing in the sleeve comma rendering the large-precision rotating prime on the tailstock period Even so comma in orEPTTto satisfy specified EPTT needs of the machining process comma it is possible to transfer the plug board from the flange groove in the front of the sleeve to the groove around the entrance finish of the major shaft in orEPTTto correct the principal shaft and receive a EPT cEPTTr period of time
10 rpar The main elements are inspected strictly by the CMM to ensure an excellent high quality period
Our Basic principle colon MaXiHu (West EPT) Dis.mize Buyer aposs Profitability unEPTTthe minimum invest EPT interval
Software colon This collection CNC horizontal lathe can uEPTTze higher-speed steel and carbide chopping tools to complete tough or complete turning process for not only the non-ferrous metals like a variety of construction steels comma casting steels and irons comma but also the exterior solinternal cylindrical sol conical sol spherical surfaces comma thread of non-metallic components and all types of the area of curve rotary physique interval What aposs more comma it can also comprehend the constant speed cutting line for turning commagrinding and milling the complex elements comma which saves fixture clamping time and enhances functioning effectiveness for customers period of time
two interval EPTnical Parameters
Title | CG61100 | CG61125 | CG61160 | CG61200 | CG61250 | CG61300 | |
Description | Device | ||||||
Max period EPTg Above Bed | mm | 1000 | 1250 | 1600 | 2000 | 2500 | 3000 |
Max time period EPTg Above the skateboard | mm | 650 | 800 | 1200 | 1650 | 1800 | 2800 |
Max period of time WeigEPTT of Perform-piece | T | 10 | fifteen | twenty | twenty | 20 | 40 |
Max time period Size of Operate-piece | mm | 3000-12000 | |||||
EPTs of Spindle Velocity | sol | Infinitely Variable Speed solstep-significantly less velocity | |||||
Range of Spindle Velocity | r solMin | 10-three hundred | 10-200 | ten-160 | 4-80 | four-eighty | 1 period6-sixty three |
Chuck Diameter | mm | 800 | 1000 | 1250 | 1600 | 2000 | 2500 |
X commaZ-AXiHu (West EPT) Dis.s Feed Range | mm solMin | -3000 | |||||
Horizontal Stroke | mm | 500 | 625 | 800 | 1000 | 1250 | a thousand |
EPTTitudinal Stroke | mm | 3000-12000 | |||||
Major Driving EPT | Kw | eleven | 22 | forty five | seventy five | seventy five | 75 |
Chopping Power lparCarriage rpar | Kn | four | 6 | 20 | forty | 40 | 60 |
Sleeve Diameter of EPTTilstock | mm | 180 | a hundred and eighty | 290 | 290 | 290 | 480 |
Spindle Diameter of tailstock | mm | one hundred twenty five | 125 | one hundred sixty | 160 | a hundred and sixty | 240 |
Rermarks colon
1 time period The over six models of EPT Obligation Horizontal Lathe EPTT are the stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd configurations comma we can also style and manufacture EPT lathe EPTTs in accordance to the person aposs workpiece characteristics interval It can be guide or CNC management comma equally are available period of time
2 period This sequence large obligation horizontal Lathe has been exported to Norway comma TEPTTd comma Romania comma Iran comma Russia comma Chile comma Indonesia for machining railway components comma vehicle areas comma mining and metallurgy comma delivery developing comma wind EPTT and other EPTTry market interval
3 period of time Package deal and Cargo
Anti-Rust Oil sol Anti-Corrosive Oil for the EPTT EPTT comma then wrapping the protective movie
EPTen Box Bundle comma or vacumm bundle is also obtainable in accordance to buyer aposs EPTT request time period
4 time period Soon after-sale Services amp Maintenance
one period We provide skilled technical education for consumers apos operators and maintenance workers to permit them to correctly use and work the lathe and have out normal servicing period
2 period of time Warranty time period colon One yr soon after acceptance of the lathe period of time We can also increase the maintenance time for each consumer aposs EPTT calls for to two or three a long time interval
3 interval In situation of any quality problem identified for the duration of procedure comma the factory will dispatch personnel get there to the user aposs spot inside of 48 several hours lpardomestic customers rpar amp inside of 3 daEPTT lparEPT Buyer rpar and the specialized workers gained apost go away just before resolving the malfuntion interval
four period The business will freely provide various EPT and mechanical elements for the obtained lathe well timed within warranty time period time period
5 period of time The company will give life span assure for the consulting services in terms of application comma maintenance comma fix comma renovation comma and so on of equipments interval
For a lot more details comma please feel free of charge to get in touch with us period of time Thanks excl